Shore side considerations such as beach access, site availability, and access to suitable power and backhaul will often drive selection of a landing location.
Mallin personnel have been responsible for selection and permitting of landing sites for systems in many parts of the world.
In addition, we have managed the installation of the systems and the construction of the stations and backhaul.